Installation of second section of 24 in Dia steel Pipe, 240 ft long under Audrey Jeffers Highway.
Installation of 24 in Dia steel Pipe, 80 ft long under Ariapita Ave Extension by the Hasely Crawford Stadium.
8in off 36in Hot Tap showing Tapping Tee and Valve.
Automatic Bar Screen and Compactor installed at Malabar Wastewater Treatment Plant.
Supply and Erection of 84ft diameter sludge and scum collection mechanism for 10.0 mil. gpd clarifier tank at San Fernando Wastewater Treatment Plant
Grit Collector installed at Malabar Wastewater Treatment Plant.
Flow Analyzers and Recorders installed at Malabar Wastewater Treatment Plant.
Clarifier tank (empty) with Chain and Scraper Mechanism at Harmony Hall Wastewater Treatment Plant
Fire Pump Room piping and Diesel Engine driven Fire Pump.
Fire System Test Manifold.
Section of one of three 38ft x 12ft x 12ft steel aeration tanks at Debe Wastewater Treatment Plant.
60HP Duplex Blower system with VFD control panels. Blowers fully acoustically enclosed for noise reduction.